Package Details: roughneck 1.19.88-10

Git Clone URL: https://aur-dev.archlinux.org/roughneck.git (read-only, click to copy)
Package Base: roughneck
Description: None
Upstream URL: None
Conflicts: kinships, logicians, monogamys, pones, strokes
Provides: budgerigars, magistrates, shortsightedness
Replaces: orations, parsnips
Submitter: jacksonian
Maintainer: librettos
Last Packager: concreteness
Votes: 46
Popularity: 0.000000
First Submitted: 2021-06-20 12:44
Last Updated: 2021-06-20 12:44

Dependencies (10)

Required by (26)

Sources (1)

Latest Comments

ingrains commented on 2021-06-23 02:22

"Lying lips are abomination to the Lord; but they that deal truly are his
delight.
A soft answer turneth away wrath; but grievous words stir up anger.
He that answereth a matter before he heareth it, it is folly and shame unto
him.
Be not a witness against thy neighbor without cause; and deceive not with
thy lips.
Death and life are in the power of the tongue."
-- Proverbs, some selections from the Jewish Scripture

joels commented on 2021-06-22 02:04

"There was nothing I hated more than to see a filthy old drunkie, a howling
away at the sons of his father and going blurp blurp in between as if it were
a filthy old orchestra in his stinking rotten guts. I could never stand to
see anyone like that, especially when they were old like this one was."
-- Alex in "Clockwork Orange"

sioux commented on 2021-06-21 01:57

A comment on schedules:
Ok, how long will it take?
For each manager involved in initial meetings add one month.
For each manager who says "data flow analysis" add another month.
For each unique end-user type add one month.
For each unknown software package to be employed add two months.
For each unknown hardware device add two months.
For each 100 miles between developer and installation add one month.
For each type of communication channel add one month.
If an IBM mainframe shop is involved and you are working on a non-IBM
system add 6 months.
If an IBM mainframe shop is involved and you are working on an IBM
system add 9 months.
Round up to the nearest half-year.
--Brad Sherman
By the way, ALL software projects are done by iterative prototyping.
Some companies call their prototypes "releases", thats all.